Do you want to power up your business with solar? For medium-sized to large industries with hefty energy needs, investing in 100kw solar system in Melbourne is the best bet. With federal and state government incentives, this solar installation has become far more economical than it was before.
At Online Air & Solar, our team of CEC accredited solar panel installers specialise at 100kw solar system installation with performance guarantee and long-term efficiency. Our years of experience and positive industry reputation have helped us become the first choice of Melbourne businesses for all their commercial solar needs.
REQUEST A CALLBACK
Call Back
How much does a 100kW solar system cost?
Compared to past many years, the cost of installing a solar system has come down a lot. The cause of this decline may be the government incentives or rising competition among solar manufacturing companies.
Choosing a 100kw solar system and solar panels is a cost-saving deal for almost all large businesses that require extensive energy to operate. The average cost of 100kw solar system is approximately $85,140 in Melbourne.
How much energy does a 100kw solar system produce?
When it comes to 100kw solar system output, you can expect to produce around 350 to 450 kWh per day or 130,000 to 160,000 kWh energy annually. This round figures to about 30% off the overall power bill for a large businesses having an annual power expense of about $50k.
However, the energy produced depends on a lot of other factors, such as sunlight, weather conditions, and efficiency of your solar panels. With 100kw solar system inverter, you can expect to save even more dollars.
How much roof space is needed
for 100kW commercial solar panels?
The exact roof space you need depends on the dimensions of solar panels you need. If you have decided installing low efficiency system, more panels will be needed. Comparatively, high quality panels require less count of panels and roof space.
Most solar panel range in power output from 275 to 350 watts and are roughly 1.6 metres by 1 metre in size.
What is the payback period for a 100kW solar pv system?
The time it will take for your solar installation to make up for its initial cost is payback period. Once your solar installation has paid for its initial installation costs, and start exporting energy to the grid, the payback period starts.
If you have 100kw solar battery system, the payback period will eventually rise. Most 100kW commercial solar installations will complete their payback period within 3 to 5 years.